Tue. May 12th, 2026
Free Solar Panel SchemeFree Solar Panel Scheme

The Chief Minister Punjab Free Solar Panel Scheme (also known as the Roshan Gharana Program) has successfully transitioned into its massive rollout phase.

On February 2, 2026, CM Maryam Nawaz Sharif held a digital balloting session to select the first wave of over 94,000 winners for the 2026 cycle. The program is designed to provide complete solar systems to low-income households, significantly reducing electricity bills.

Eligibility Tiers (2026)

The scheme is categorized based on your monthly electricity consumption over the last six months:

Monthly UnitsBenefit TypeSystem Size
Below 200 Units100% Free0.55 kW to 1.1 kW
200 – 500 Units90% Subsidy2 kW to 3 kW
Above 500 UnitsInterest-Free LoansFinancing via Bank of Punjab (BOP)

Key Rule: If you consume more than 500 units, you are not eligible for the “free” plates but can apply for the 0% markup loan to install a larger system.

How to Apply Online: Step-by-Step

Applications are processed digitally to ensure transparency. Follow these steps:

  1. Visit the Portal: Go to cmsolarscheme.punjab.gov.pk.
  2. Registration: Click “Register” and enter your Name, CNIC, and Mobile Number.
  3. Bill Verification: Enter your Electricity Bill Reference Number. The system will automatically fetch your consumption history for the last 6 months to determine your tier.
  4. Upload Documents:
    • Scanned copy of your CNIC (Front/Back).
    • Recent Electricity Bill.
    • Proof of residence (Property documents or Landlord’s NOC if you are a tenant).
  5. Submit & Track: Once submitted, you will receive a Tracking ID via SMS.

Alternative: Apply via SMS

Send your Reference Number [Space] CNIC to 8800. You will receive an automated response regarding your eligibility status.

What’s Included in the “Free” Package?

Successful applicants in the 100–200 unit tier receive a complete “Plug-and-Play” system:

  • Solar Panels: High-efficiency plates (linked to your CNIC to prevent theft/sale).
  • Inverter: A lithium-compatible or hybrid inverter.
  • Batteries: For night-time backup (included in most 2026 kits).
  • Installation: Professional wiring and installation by government-authorized teams at no cost.

Verification and Installation Timeline

  • Step 1 (Balloting): Successful candidates are selected via computerized lottery.
  • Step 2 (Physical Audit): Teams visit your home to verify your roof space and electrical connection.
  • Step 3 (Installation): For the February 2026 batch, installations are scheduled to begin by late March 2026 and will be completed by July 2026.

Important Precautions

  • No Agents: The registration process is completely free. Do not pay any “processing fee” to anyone claiming to be a government agent.
  • Theft Prevention: All hardware is digitally tagged. If a solar panel is uninstalled or sold, the system will automatically deactivate and legal action may be taken.
  • Tenant Rights: Tenants can apply, but they must provide a written NOC (No Objection Certificate) from the property owner.

By Javed Chaudhry

Javed Chaudhry is the founder of Mobitech.pk and a passionate tracker of Pakistan's gold and silver markets. He is committed to providing real-time, accurate, and city-wise price updates to help you make smarter investment decisions.

Leave a Reply

Your email address will not be published. Required fields are marked *